Route 68
Widening Project
Background and Scoping
Route 68 is a two-lane undivided roadway constructed in the early 1940s. It
serves as the primary transportation facility between SR 1 and the City of
Pacific Grove, Pebble Beach and the CHOMP. In the mid 1950s, this portion of
the roadway was upgraded with improved radii and superelevation. It was
subsequently designated as part of Route 68 with a posted speed of 55
kilometers per hour (kph). Currently there are two 3.6 meter (m) (11.8 feet)
lanes with shoulders ranging from 0.6 m (2.0 feet) to 1.2 m (3.9 feet).
More>>>
|