Sign Ordinance

CHAPTER 31 -  SIGNS, Complete Sign Ordinance (READ DISCLAIMER)
CLICK TO SPECIFIC SECTIONS IN THE LEFT GREY CONTENTS AREA ON THE CITY CODE WEB PAGE.

ARC 96-02

- Exterior Lighting Design Guidelines for Illuminated Signs

93-182 

- Resolution Adopting Neon and Electric Window Sign Policy Guidelines for Property within the City of Monterey
topic links
ARC Review
Sign Ordinance
   - Submittal Requirements
Sign Standards
Lighting
Signs on Lighthouse
Examples

Architectural Review Committee - Submittal Requirements for Sign Review

Please submit the items listed below to the ARC, when you apply for Sign Review
1. Two sets of plans containing the following:
  - Location plan in the form of a site plan and elevation plan, to scale, illustrating proposed sign as it will appear on the project
-
Location plan must clearly illustrate the proposed sign(s) and its relation to surrounding improvements, including other existing signs
-
Location plan must show all existing signs
 
2. Two copies of drawing of sign(s), to-scale, indicating:
  - Dimensions of sign and letters
- Complete sign copy
- Style of lettering
- Materials of sign
- Method of lighting
- Method of construction and/or installation
 
3. One set of color sample(s) or colored rendering to illustrate color(s) of sign. Plex or plastic face signs will require submittal of material sample for accurate color representation.
 
4. In cases where an existing sign is applied for clear, legible photographs of the sign can be substituted for drawings. The photographs must show:
  - Sign color
- Location of sign on building and relationship to doors, windows and other architectural features
- The dimensions of the sign must also be provided
 
5. The Sign Review Fee.

Return to top | Return to ARC main page
 


Back to PEEC Home
Approval Documents | Land Use & Area Plans
Planning Commission | Architectural Review | Historic Preservation | Zoning
Engineering
| Environmental Compliance | Economic Development
Housing & Property Management | Neighborhood Improvement Program (NIP)
Major Projects Status | Water Chart | City Code & Enforcement | Fees | Contact Us | FAQ's
PLANS & PUBLIC WORKS DEPT. SITE INDEX

hmpgbtm.gif (1739 bytes)
 


©2008 City of Monterey. All Rights Reserved. http://www.monterey.org/planningengineering/arc/sign_ord.html    C.Mata 01/15/09