en-USes-MX
  Search

NIP projects for FY 14-15 will be available Spring 2014 




Contact Us
Tom Reeves
City Engineer
(831) 646-3448
email

Kim Allen
Administrative Assistant II
(831) 646-3887
email

PEEC, Engineering Office

580 Pacific Street, Room 7
(831) 646-3921
Fax: (831) 646-3405
Hours: 8 a.m. to 5 p.m.,
Mon. - Fri. and closed 12 to 1 for lunch

Neighborhood

Project Title

Project Number

Video Link

Current Estimates

View Project Descriptions Adobe PDF

Aquajto Oaks

None


Alta Mesa

Don Dahvee Greenbelt Fuel Reduction AM-1


$25,000


Iris Cyn Creek Restoration Phase 1 AM-2

Watch Video

$250,000

Via Mirada Sidewalk AM-3

Watch Video

$45,000
Casanova – Oak Knoll

CONA Park Shade Structure & Fence Replacement COK-1

Watch Video

$35,000


CONA Park Center Photo Surveillance COK-2

Watch Video

$25,000


N Fremont Street Widening/Beautification Study COK-3

Watch Video

$12,000
Deer Flats

Caribou Ct (7) Sidewalk Improvement DF-1

Watch Video

$8,700


Deer Forest Dr Resurface/ADA Upgrade DF-2

Watch Video

$60,000
Del Monte Beach

DMB Street Sweep Schedule DMB-4


No City Policy

Roberts Av Fence DMB-6

Watch Video

$45,000

Casa Verde Rec Trail Crossing Ph 2 DMB-8

Watch Video

$80,000

Del Monte Beach Walkway Replacements DMB-9

Watch Video

$15,000
Del Monte Grove – Laguna Grande

Virgin/Montecito Ped Access Improvements DMG-1


$175,000


LG Park Exit ADA Access/Parking Lot Improvements DMG-2


$145,000
Downtown

Hartnell Gulch Park Ph 1 DT-3

Watch Video

$50,000

Franklin/Washington Traffic Signal Upgrade DT-4

Watch Video

$500,000

Pacific Street Decorative Signal Poles DT-5

Watch Video

$60,000
Fisherman Flats

FF Greenbelt Fuel Reduction FF-1


  $10,000

San Vito Cir/Via Isola/Park Lighting FF-2

Watch Video

$25,000


Josselyn Cyn Rd Drainage FF-3

Watch Video

$75,000

Foothill School Olmsted Drop-off Property Purchase FF-4

Watch Video

$310,000

Greenbelt Goat Fuel Reduction FF-5


$20,000

Josselyn Cyn Two Radar Speed Signs FF-6


$30,000

Augusta Pl/Etna Pl/Via Isola Resurface/ADA Ramps FF-7

Watch Video

$140,000

Foothill School Sports Field Improvements FF-8

Watch Video

$22,000
Glenwood

Glenwood Bus Stop ADA Improvement GW-1

Watch Video

$100,000


Glenwood Sidewalk ADA Improvement GW-2

Watch Video

$80,000
Monterey Vista

Mar Vista Dr/Soledad Dr Drainage/Ped Improvement Study MV-1

Watch Video

$25,000


Via Gayuba (San Bernabe to Via Paraiso) Resurfacing MV-2

Watch Video

$190,000


Monterey Vista Greenbelt Fuel Reduction MV-3


$70,000


Via Paraiso Park Hardscape Improvements MV-4

Watch Video

$25,000


Via Del Rey/Herrmann Right Turn Lane Elimination MV-5

Watch Video

$250,000

Doud/Martin Retaining Wall MV-6

Watch Video

~~~

Doud 900 Blk Repaving MV-7

Watch Video

$105,000

Via Chiquita Storm Drain Improvement Ph 2 MV-8

Watch Video

$85,000

MV Street Resurfacing 2014 MV-9

Watch Video

$460,000

Via Descanso Storm Drain MV-10

Watch Video

$45,000
New Monterey

Irving 800 Blk Street Widening NM-1

Watch Video



Laine 300 Blk Widening NM-3

Watch Video

$405,000


David/Prescott Radar Speed Signs NM-5

Watch Video

$45,000


Drake Belden Open Space

NM-6

Watch Video



Belden 300 Widening NM-7

Watch Video

$410,000


David Open Space NM-8

Watch Video

$10,000


Cannery Worker Shacks Refurbish NM-10

Watch Video

$27,000

Presidio Historic Park Stables Ph 1 NM-11

Watch Video

$25,000

Presidio Pathway to Serra Monument NM-12

Watch Video

$155,000

Presidio Child Care Center Paint & Playground Gates NM-13




Hilltop Park Security Light Replacement NM-14

Watch Video

$19,000

Hilltop Park Renovation NM-15

Watch Video

$20,000

Taylor 600 Blk Walkway ADA Upgrade Ph 2 NM-16

Watch Video

$40,000

Archer Park Retaining Wall/Fence Repair NM-17

Watch Video

$22,000

Foam/Lighthouse Corner Landscaping NM-18

Watch Video

$25,000

Rec Trail Beautification Ph 1 NM-19

Watch Video

$70,000
Oak Grove

Seventh St 1250 Gutter Drainage Improvement OG-1


$36,000


Sloat Ave Resurface/Crosswalk Improvement OG-2


$205,000

Sloat at Fifth Crosswalk Warning System OG-3


$255,000

Fifth St (Sloat to Ocean) Resurface OG-4


$112,000

Eighth St (Tenth to Park) Resurface OG-5



Old Town

Larkin 301 Driveway Reconstruct OT-1

Watch Video

$18,500


Franklin 602/604 & Larkin 392/394 Driveway Reconstruct OT-2

Watch Video

$31,000

Larkin 423 Driveway Reconstruct OT-3

Watch Video

$18,000

Franklin 599 Driveway Reconstruct OT-4

Watch Video

$18,000

Cedar/Franklin ADA Ramps OT-5

Watch Video



Larkin 475 Driveway Reconstruction OT-6

Watch Video

$18,500

Watson Resurface Franklin to Scott OT-7

Watch Video

$208,000

Old Town Landscape/Irrigation OT-8

Watch Video

$16,000

Van Buren 300 Blk Gutter Drainage Ph 1 OT-9

Watch Video

$190,000

Old Town Street Sweep Schedule Signage OT-10

Watch Video

No City Policy
Skyline Forest

SF Greenbelt Fuel Reduction SF-1


$25,000


Wyndemere Lower Canyon Drainage Ph 3 SF-2

Watch Video

$575,000


Veteran's Park Dr Bicycle Safety/Ped Path SF-3 Watch Video

$75,000

Skyline Ridge

None



Villa Del Monte

Casa Verde/Helvic/Portola/McNear Area Improvements VDM-1 Watch Video



Del Monte School Playground Equipment

VDM-2

Watch Video


Citywide

Colton Hall Restoration/Preservation Ph 2 CW-1

Watch Video

$120,000


Cemetery Irrigation Last Phase CW-2

Watch Video

$25,000


Colton Hall Holiday Tree Replacement CW-3

Watch Video

$35,000


Colton Hall Irrigation Upgrade CW-4

Watch Video

$35,000


DTM Park Climbing Structure CW-5

Watch Video

$75,000


El Estero Park Light Poles/Light Replacement CW-6

Watch Video

$25,000

Jacks Park Backstop/Hardscape Renovation CW-7

Watch Video

$50,000

Rec Trail B Walkway Repairs CW-8

Watch Video

$30,000

San Carlos Beach Sidewalk/Step Repair CW-9

Watch Video

$125,000

Shoreline Park Relandscaping CW-10

Watch Video

$15,000

FS1 Fresh Air Supply Compressor CW-12

Watch Video

$95,000


FS1 Exhaust Extractor Installation CW-13

Watch Video

$60,000

FS1 Window Replacement
CW-14

Watch Video

$40,000

FS2 Window Replacement CW-15

Watch Video

$45,000


FS3 Window Replacement
CW-16

Watch Video

$55,000


DTM Train Access Improvements CW-17

Watch Video

$100,000

FS1 Fire Safety Clothing Storage CW-18

Watch Video

$57,000


Veteran's Park Repairs CW-19

Watch Video

$50,000


MSC Bike Rack Replacement CW-20

Watch Video

$3,000


Council Pews Reupholster CW-21

Watch Video

$26,500


El Estero Lake Fishing Pier Repairs CW-22

Watch Video

$30,000


MYC Entrance Drainage CW-23

Watch Video

$30,000

MYC BBQ/PicnicTable Upgrade/ADA Access CW-24

Watch Video

$25,000

MSC Sun Deck Awning Installation CW-25

Watch Video

$100,000

MSC Sign/Relandscape CW-26

Watch Video

$37,000

Library Kitchen Addition CW-27

Watch Video



Hilltop/Via Paraiso Park Tennis Court Resurfacing CW-28

Watch Video

$20,000

Sister City Park Signage/Beautification CW-29

Watch Video

$15,000

Homeless Campground Study CW-30

Watch Video

$50,000

Golden State Theatre Acquisition Ph 1 CW-31

Watch Video

$500,000

Veteran's Park Bocce Ball Court CW-32

Watch Video

$150,000

Library Community Room Projection Improvement CW-33

Watch Video

$20,000

Bicycle Lane Improvements CW-34

Watch Video

$100,000