en-USes-MX
  Search

Approved NIP Projects for FY 13-14




Contact Us

Jeff Krebs
NIP Coordinator
(831) 646-3877
email

Pamela Renteria
Administrative Assistant II
(831) 646-3887
email

PEEC, Engineering Office

580 Pacific Street, Room 7
(831) 646-3921
Fax: (831) 646-3405
Hours: 8 a.m. to 5 p.m.,
Mon. - Fri. and closed 12 to 1 for lunch

 
Neighborhood Project Title Project Number Video Link Current Estimates
      View Project Descriptions    
Aquajto Oaks
   None  

 

Alta Mesa
   Don Dahvee Greenbelt Fuel Reduction  AM-1

 

$25,000

Casanova – Oak Knoll
   COK Park Improvements  COK-1

 $25,000

   COK ADA Sidewalks  COK-2

 $67,000

Deer Flats
   None  

 

Del Monte Beach
   Tide/Beachway Conceal Portable Toilets

 DMB-3

$16,000


 DMB Boardwalk Repair/Sand Mitigation  DMB-6

  

 $175,000

   Tide Ave Bike Racks  DMB-16

 

 $2,000

Del Monte Grove – Laguna Grande
   Laguna Grande Park Soccer Field Artificial Turf  DMG-2

 $200,000

   English Ave 200/300 Blk Concept Design Plan  DMG-3

 

 $40,000

Downtown
   None  


 

Fisherman Flats 

 FF Traffic Calming Plan  FF-2

 $60,000

   FF Greenbelt Fuel Reduction  FF-3

 

 $25,000

Glenwood
   None  


 

Monterey Vista
 Cut-off project  Pacific 1200 Blk Install Curb/Gutter No Sidewalk  MV-1 

$150,000

   Quarry Park Revitalization  MV-5

 

 $15,000

   Monte Vista Playground Equipment  MV-9

 

 $40,000

   Soledad Drainage Improvement  MV-11

 

 $38,000

New Monterey
   Cypress Park Repairs/Upgrade  NM-4

 $97,000

   Scholze Ctr Meeting Rm Audio Loop Installation  NM-5

 

 $12,000

   Hilltop Park Landscape Renovation  NM-8

 $10,000

   Rec Trail Repairs & Landscaping  NM-11

 

 $50,000

   Taylor at Irving Storm Drain Upgrade  NM-13

 

 $155,000

 

 NM Ped Hawthorne/Dickman ADA , Prescott 1650

 NM-16 

   

 $48,000

   Prescott/Devisadero Entry Improvements  NM-18

 

 $5,000

   Lighthouse Adaptive Traffic Signal System  NM-20

 

 $100,000

   Hoffman 1481 Walkway Repair  NM-21

 

 $14,000

Oak Grove
   None  

 

 

Old Town
   Franklin/Watson ADA Ramps  OT-3

 

 $180,000

Skyline Forest
   Wyndemere Lower Canyon Drainage Ph 2  SF-1

 

 $235,000

   SF Greenbelt Fuel Reduction  SF-2

 

$50,000

   SF Greenbelt Trees  SF-3  

 $50,000

Skyline Ridge
  None


Villa Del Monte

 Ferrante Park Fence Repair  VDM-1

 $50,000


 Ferrante Park Batting Cage Fence Repair

 VDM-2

 $5,000

   VDM Revitalization/ADA Study  VDM-4  

 $75,000

Citywide

 Sollecito Ball Park Field Renovation Ph 2  CW-1

 $200,000

   Library Community Rm Audio Loop Installation  CW-2

 

 $12,000


 DTM Park North Side Path ADA Upgrades  CW-3

 $105,000


 San Carlos Beach Shower Drain Replacement  CW-5

 $9,000

   Rec Trail Pedestrian Path Study & Signage  CW-10

 $52,000

   CERT Container Solar Radio System  CW-11

 $13,000

   DTM Train Develop Specifications  CW-12

 

 $35,000

   FS 1 Air Compressor  CW-13

 $8,200

   FS 3 Garage Door Widening  CW-14

 

 $45,000

   Corp Yd Alternate EOC Improvements  CW-15

 

 $32,000

   Library Public Address System  CW-16  

 $28,000

   Wharf 2 Restroom Replace/Remodel  CW-17

 

 $150,000

   Colton Hall Restoration/Preservation  CW-18

 

 $140,000

   MSC Replace Surveillance System  CW-23

 

 $25,000

   Del Monte Median/Entryway Beautification  CW-26

 

 $20,000

   N Fremont Median Landscape  CW-27

 

 $20,000

   DTM Park Boat Structure Replacement  CW-29

 

 $35,000