en-USes-MX
  Search

NIP Approved Projects for FY 2011-12




Contact Us

Jeff Krebs
NIP Coordinator
(831) 646-3877
email

Pamela Renteria
Administrative Assistant II
(831) 646-3887
email

PEEC, Engineering Office

580 Pacific Street, Room 7
(831) 646-3921
Fax: (831) 646-3405
Hours: 8 a.m. to 5 p.m.,
Mon. - Fri. and closed 12 to 1 for lunch

Neighborhood Brief Description Project Number Project Nomination
 Form
Video Link Current Estimates
Aquajto Oaks
  Aguajito Oaks Streetlights  AO-03

 

 

 $1,600

Alta Mesa
  Don Dahvee Greenbelt  AM-05

 

 

 $25,000

Casanova – Oak Knoll
  None        
Deer Flats
  None  

 

   
Del Monte Beach
  DMB Boardwalks  DMB-02

 

 

 $20,000

  Casa Verde Rec Trail Crossing Study  DMB-04

 

 

 $60,000

Del Monte Grove – Laguna Grande
  DMG Entry Sign  DMG-01

 

 

 $13,200

  English Two Radar Speed Signs  DMG-03

 

 

 $40,000

  Laguna Grande Park Walkway  DMG-05

 

 

 $12,000

Downtown
  Griffin Plaza Lights  DT-04

 

 

 $17,000

Fisherman’s Flats 

FF Fuel Reduction  FF-02

 

 

 $25,000

  Monterey Woods Traffic Mirror  FF-04

 

 

 $1,500

Glenwood

Glenwood Cir Radar Speed Sign  GW-04

 

 

 $20,000

Monterey Vista
  Via Buena Vista Sewer Replacement  MV-02

 

 

 $13,800

  Via Chiquita/Via Ventura/Sierra Vista Drainage  MV-16
 MV-20
 MV-26

 
 
 

 
 
 

 $90,000

  Mar Vista/Via Castanada Erosion Control  MV-27

 

 

 $1,600

  Soledad/Mar Vista Connect Storm Drain Pipe  MV-37

 

 

 $250,000

Cut-off Project #9 Monte Vista School Replace Play Equip Rubber Surface  MV-43

 

 

 $29,000

New Monterey
  Dickman/Jessie/Lottie Drainage  NM-02

 
 
 

 
 
 

 $147,000

  Lighthouse EIR/Prelim Eng  NM-20

 

 

 $100,000

  Scholze Park Lighting  NM-23

 

 

 $8,500

  New Monterey Trip Hazards  NM-27

 

 

 $13,200

  Sloat Monument Repair  NM-29

 

 

 $93,300

  Cypress Park Tot Lot ADA  NM-33

 

 

 $5,000

  Hilltop Park Replace Tot Lot Sand with Wood Fiber  NM-34

 

 

 $12,000

Oak Grove
  703 Ocean Drainage Improvements  OG-03A

 

 

 $38,200
Cut-Off Project #3 4th 1100 Blk Drainage Improvements  OG-03B

 

 

 $53,400
Old Town
  Van Buren/Franklin Curb Ramp Ph V  OT-18

 

 

 $45,000

  Hwy 68/Presidio Gate Study  OT-20

 

 

 $200,000

Skyline Forest
  Wyndemere Log Drop Repair
 SF-10

 

 

 $92,000
  Skyline Forest Greenbelt Fuel Reduction Ph VI
 SF-11

 

 
 $50,000
Via Del Monte
Cut-off Project #8
Del Robles Install Sidewalk  VDM-03

 

 

 $27,300
  Encina/Casa Verde Traffic Calming
 VDM-05

 

 

 $125,000
  Ferrante Park Irrigation Replacement
 VDM-07

 

 

 $30,000
Cut-off Project #2
Ramona/Neighborhood Sidewalk Repair

VDM-10

 $60,000
  Casa Verde Sidewalk Repair
 VDM-11

 

 

 $2,500
Citywide
Cut-off Project #1
Mark Thomas Sidewalk/Bike Lane   CW-04

 

 

 $180,000
  Bike Rack Installation
 CW-18

 

 
 $25,000
Cut-off Project #7
Dennis the Menace Walkway/Access Improvements Ph II
 CW-20

 

 

 $65,000
Cut-off Project #10
Monterey Bay Park Seat Wall/Irrigation
 CW-21

 

 

 $15,000
  El Estero Picnic Area Improvements
 CW-23

 

 

 $22,000
Cut-off Project #5
El Estero Lake Edge Improvements Ph V
 CW-24

 

 

 $100,000
  City Emergency Power Hookup
 CW-28

 

 
 $45,000
  Del Monte/Pacific Intersection Safety Improvement
 CW-33

 

 

 $50,000
Cut-off Project #6
Munras/Soledad Freeway Entrance Signage
 CW-41

 

 

 $15,000
Cut-off Project #4
Dredging Lagunita Mirada
 CW-44A

 

 

 $150,000
  FF#3 Replace Emergency Water Tank
 CW-45

 

 

 $7,500
  City CMP/F Rated Storm Drain Pipe Rehabilitation
 CW-46

 

 

 $147,320
  Library Drinking Fountain Upgrades
 CW-59

 

 
 $24,700
  Library Fire Alarm System Replacement
 CW-63

 

 
 $70,100
  Library Exterior Lighting Upgrades
 CW-66

 

 
 $23,500
  Monterey Sports Center Recoat Locker Room Floors
 CW-73

 

 
 $10,000