Building Permit Information

What types of permits are there?

  • Building
  • Electrical
  • Mechanical
  • Plumbing
  • Grading

When do I need a permit?

  • To build a storage shed in excess of 120 square feet.
  • To build a fence greater than 6 feet in height.
  • To build a retaining wall greater than 3 feet.
  • Window framing changes
  • Re-roofs
  • For any electrical work EXCEPT changing plugs or lights.
  • To replace or install a water heater.
  • To replace or install a furnace.
  • To replace or install a gas, water or waste pipe.
  • To install a spa or hot tub.

How long will plan check take?
Depending on the size of the project, plans are normally returned within 3 to 15 working days.

Who can take out a permit?
Only a building owner or a licensed contractor.

Who else do I need to contact?

What else?
Even if you don't need a Building Permit, you need to contact the
City Planning Division at 831.646.3885 for ANY EXTERIOR CHANGES made.

 

Return to Building Safety & Inspection Main Page
Return to top


SITE MAP
Building & Safety Inspection | Planning Division | Housing Division 
Economic Development | Boards & Commissions | Contact Us | FAQ's
Community Development Main Page 
City Services | City Departments 

City of Montery Home Page Button (1747 bytes)

Rev. 09/15/04 -L. Huelga -  http://www.monterey.org/commdevelop/bldgsafety/permit_info.html