Plan Check Information List

The following items need to be provided before your project will be plan checked:

New & Remodel Homes | Commercial & Apartments
What plans should include | Additional Requirements

New Dwellings, Additions, and Remodels

Plans 4 sets
Energy calculations (if adding conditioned space) 2 sets
Truss calculations (if applicable) 2 sets
Soils report 2 sets
Structural calculations 2 sets
Specifications 2 sets

Commercial and Multi-Family  (Apartments)
New Construction and Additions

Plans (to include architectural, structural, electrical, plumbing and mechanical) 5 sets
Energy calculations 2 sets
Truss calculations (if applicable) 2 sets
Soils report 2 sets
Structural calculations 2 sets
Specifications 2 sets

Tenant Improvements

Plans 4 sets
Energy calculations 2 sets
Other calculations or documents 2 sets

Wharf and City of Monterey projects

Plans 6 sets
Energy calculations 2 sets
Other calculations or documents 2 sets


A typical set of plans should include:

  • A site/plot map

  • A foundation plan

  • roof & floor framing plans

  • construction sections/details

  • appropriate floor plans
     

Additional requirements for any of the above:

  • Complete address and parcel number

  • Job valuation

  • Job description

  • Minimum Paper Size is 11" X 17"

  • If your work costs $1,000.00 or more, battery operated smoke detectors are needed in halls
    and bedrooms.

  • Plans should be clear and legible.

 

Building Home | Plans & Public Works Home
      Building Permit Information | Application | Fees | Plans Check List | Schedule Inspection
Backwater Valves | Home Remodels | Property Inspections | Green Building
| City Code
Contact Us | FAQ's | Code Enforcement | Guide to Residential Ordinances
Contractors State License Board (external Website)

hmpgbtm.gif (1739 bytes)
 


©2008 City of Monterey. All Rights Reserved. http://www.monterey.org/building/checklist.html    L. Huelga 10/01/08