NEIGHBORHOOD IMPROVEMENTS
PROJECT DESCRIPTIONS
FY
2004-2005 |
Projects Fully Funded | Other Funded
Projects | Cut-off Projects
Any links below are posted in Adobe Acrobat PDF file format.
If you already have Adobe's Acrobat Reader installed on your computer, you
may view the reports by clicking on the links below.

If you don't have the FREE Adobe Acrobat Reader, you can obtain it from
Adobe by clicking on the linked Acrobat icon.
PROJECTS FULLY FUNDED
WITH BASE ALLOCATION
-
CONA Preschool Play Area Decking
Plastic wood 2" x 6" decking entire area of pre-school play area flush
with the present concrete step.
-
Install Rubber Surface in Tot Lot @ Laguna Grande Court Park
Existing tot lot surface is wood chips. Residents have asked us to install
rubber to reduce slivers and animal feces.
-
Hoffman/Grace Retaining Wall
The slope of the corner property is eroding onto the pavement at the
stop sign. A small wall will hold the slope in place.
-
ADA Curb Ramps Phase I (New Monterey)
This will begin a program to install curb ramps at the most used
intersections in the New Monterey neighborhood.
-
Cannery Row Park Plaza Lighting
Install lighting in the area between Foam Street and the Recreation
Trail.
-
ADA Curb Ramps (Del Monte Beach)
This will install curb ramps in the Del Monte Beach neighborhood.
-
Ruth Vreeland Monument – San Carlos Beach
Install a monument plaque in the "seat rock" at San Carlos Beach Park for
former Councilwoman Ruth Vreeland.
-
Josselyn Canyon Mirrors at Monterey Woods
Install convex mirror opposite the Monterey Woods entrance/exit to
help see motorists coming down Josselyn Canyon.
-
ADA Curb Ramps (Oak Grove)
This will install curb ramps in the Oak Grove neighborhood.
-
CONA Community Center Window Openers
Provide motor operated window openers for the high windows in the
Community /Center for better ventilation.
-
Vet’s Park Expansion – Design
The quarry area of Veteran’s Park is unused and is unattractive. This
project would look at the potential for expanding the campground into this
area.
-
Mar Vista Bulbouts at Toda Vista
This would add bulbouts at the crosswalks to lessen the distance
traveled by the school children crossing the street.
Return to top
PROJECTS FUNDED BY THE
POT AND PARTIAL BASE ALLOCATIONS
-
2004 New Monterey Drainage
Surface drainage improvements along the N/W side of the 1500 block of
Hoffman Avenue and the West side of the 800 block of Lyndon Avenue.
-
Via Mirada Traffic Calming
A traffic study must be done first, but the proposed project is to
construct bulbouts to slow traffic at 848 and 867 Via Mirada.
-
Jefferson/Manzanita Median and Curb Extension
This traffic calming project is to 1) construct an island on Jefferson
Street between Manzanita Street and Clay Street and 2) construct bulb outs
along Jefferson Street at the East intersection with Monroe Street.
-
CONA Traffic Calming Phase III
This is the construction phase of the approved traffic-calming plan.
The plan would be to construct medians, bulb outs, crosswalks, landscaping
and other traffic reducing measures until the budget is consumed.
-
Aquajito Oaks Entryway Improvement Project
This project will improve the landscaping entryway to the neighborhood
along Littlefield Road. Improvements will include new trees and a rock
grouping.
-
Install Pedestrian Countdown Timers on Signal at Munras/Webster
The old style "green hand/red hand" pedestrian crossing indicators
will be replaced with the newer countdown timer indicators.
-
Pacific Street Drainage and Shoulder Stabilization
A new drainage swale and slope improvements will be constructed along
the West Side of Pacific Street from Bartolomea Way to San Bernabe Way.
-
Del Monte Grove Laguna Grande Traffic Calming Phase 4
This is a continuation of construction of the approved traffic calming
measures within this neighborhood.
-
Monterey Sports Center, Remodel Women’s and Men’s Locker/Shower
Rooms
This project will replace lockers and tile in the men’s locker room
and replace shower curtains, tile upgrades, soap and shampoo dispensers,
and replace mirrors in the women’s locker room.
-
Deer Flats Alley Resurfacing
Fawn Lane between Elk Run and Caribou Court will be resurfaced and
failed areas dug out and replaced.
-
Sidewalk Fill In at 2151 & 2157 Trapani Circle
This will complete the sidewalk fill in to the neighborhood park on
Trapani Circle.
-
Villa Del Monte Traffic Calming Study
This will begin a traffic calming study to identify areas that specific
traffic calming measures can be constructed.
-
Via Gayuba Bulb Out Repair
This bulb out has an inferior entrance structure that does not channel
the storm water through the piping. This project will fix that.
-
Del Monte Beach Traffic Signal Preemption for Ambulance Egress
This would allow ambulances to deploy more quickly and safely by
installing warning signs and devices for controlling the nearby traffic
signal.
-
Lower Jefferson Street Drainage
This will add two "extended inlet" hoods to two catch basins, just above
Pierce and Dutra, for extra inlet capacity.
-
Greenwood Rise Improvements
The asphalt on this cul-de-sac has failed because of undersurface water
intrusion. The old asphalt will be removed and replaced with a base layer
of drain rock to allow the water to pass through as it migrates down the
hill.
-
Casanova Oak Knoll Driveway Reconstruction
The sidewalks in this neighborhood were constructed without proper
roll curb driveways. Cars scrape their undersides when attempting to climb
the curb and driveway pads. This project will reconstruct the curbs and
ramps with proper roll curb driveways.
-
Lower Presidio Walkway, Phase II
This will reconstruct the crosswalk at Lighthouse / Private Bolio and
connect the proposed walkway with phase I walkway. Pedestrians will be
able to traverse the area without walking around the Lighthouse Curve
roadway.
-
Belden 400 Widening
This will widen the 400 block of Belden Street to 36’ curb to curb. This
will allow parking, sidewalks and two lanes of traffic.
- NIP Contingency Account FY 2005
Return to top
CUT-OFF PROJECTS *
-
Madison Street 800 Block Street Improvements
This will repair some pavement failures as the roadway heads down into
the canyon just beyond Monroe Street.
-
Airport Road Speed Enforcement Devices
This will be a speed detection sign that will show the posted speed
limit and the driver’s speed. One detection sign in each direction.
-
Ferrante Park Irrigation Replacement
This will replace the 20+-year-old irrigation system with new
equipment and a more efficient layout pattern. Treated lake water is being
explored.
-
Fisherman’s Flats Miscellaneous Curb and Gutter Repairs
This will remove and reconstruct various curb and gutter failures.
-
Harrison Street Vets Park Pedestrian Access
This will improve the steps and path from the top of Harrison Street into
the back of Veteran’s park.
-
Wall Construction along Herrmann at Via Paraiso
Construct a small retaining wall around the North / West return to prevent
parking and erosion.
-
Hartnell Gulch Pedestrian Plan
Begin the planning process to provide a pedestrian access from Pacific
Street to Munras Avenue.
-
San Carlos Beach Park Traffic Plan – Sign Program
Signs to direct tourists and locals over to the businesses at Break
Water Cove
* A budget appropriation adjustment will be brought before Council
when funding is both identified and available
| FY 04/05 NIP
Contingency Account
|
$ 180,000 |
| NEIGHBORHOOD
IMPROVEMENT FUND TOTAL
|
$1,903,500 |
Return to top
Neighborhood
Improvement Program
Return
to Budget Main Page | Financial
Policies
General Fund Revenues |
Revenues by Program | Special Funds Revenues
General Fund Expenses |
Operating Expenses by Program
Capital Improvements Program |
Neighborhood Improvement Program
Staffing by
Program | Demographics & Statistics |
Budget News

Revised
02/21/10 L. Huelga
http://www.monterey.org/budget/2004_05/nipdescribe.html |