NEIGHBORHOOD IMPROVEMENTS
PROJECT DESCRIPTIONS
2003-2004 |
Projects Fully Funded | Other Funded
Projects | Cut-off Projects
All links below are posted in Adobe Acrobat PDF file format.
If you already have Adobe's Acrobat Reader installed on your computer, you
may view the reports by clicking on the links below.

If you don't have the FREE Adobe Acrobat Reader, you can obtain it from
Adobe by clicking on the linked Acrobat icon.
PROJECTS FULLY FUNDED WITH BASE ALLOCATION
-
CONA Playground Equipment
Purchase and install playground equipment designed for small children.
-
San Vito Circle Bus Shelter-Design Only
Design several alternatives for a school bus shelter for children
waiting for the school bus.
-
Deer Flats Park Walkway Repair
Sawcut, remove and replace concrete walkway that is cracked, broken or
uplifted.
-
Lower Presidio Walkway-New Monterey to Pacific Street
A walkway will be constructed through the Lower Presidio from Private
Bolio to Artillery Street.
-
David Avenue ADA Sidewalk Improvements
A curb and sidewalk bulb-out will be constructed around a tree planter
that is encroaching onto the sidewalk.
-
Hilltop Park Small Play Equipment Replacement
Remove and upgrade the play equipment at the lower playground for the
younger children.
Return to top
PROJECTS FUNDED BY THE POT AND
PARTIAL BASE ALLOCATIONS
-
Monte Vista School Playground Replacement
Replace the existing playground equipment with new modern equipment
for kindergarten and lower playground areas.
-
Traffic Calming CONA Phase I
- Construct 3 medians with landscaping and entrance signs.
- Construct 4 curb extensions, and
- Construct brick pavers on all crosswalks at the curb extensions.
-
Traffic Calming Del Monte Grove/Laguna Grande Phase III
Construct traffic circles, partial medians, curb extensions and
decorative crosswalks for traffic calming per the approved plan.
-
Filmore, Irving & Lyndon 700 Drainage
Lyndon will have underground pipes installed in the edge ditches;
Filmore will have a catch basin and associated piping installed at the end
of Filmore by the Presidio.
-
Robert’s Way Road Reinforcement
Build a retaining wall to stabilize the hillside under Roberts Way.
-
Ryan Ranch Animal Kennel
Replace the current animal kennel with a new kennel, which will
provide shelter from the elements and will have indoor/outdoor runs.
-
Library Plexiglas Walls
Construct see-through windscreen along the outside edge of the 2nd
story patio. Chairs and tables will be added to the deck.
-
Franklin/High Storm Drainage and Bulb-Outs
Construct catch basins and storm drains with bulb-outs and new curb
ramps. Minor storm drain improvements will also be constructed at Hellam
and at Wainwright.
-
Replace Monterey Sports Center Pool Deck
Replace the slippery pool deck with a deck with texture for greater
skid resistance.
-
Via Del Rey Sidewalks
An asphalt sidewalk and berm will be constructed for safer walking and
storm water control from Via Del Pinar to Herrmann Drive.
-
Forest Knoll & Forest Vale Storm Drains
This project will construct catch basin, and associated piping to
intercept the surface water flow on Forest Knoll before the water can turn
down Forest Vale.
-
Carmelo Park Storm Drains
Construct a catch basin and piping to intercept water before it can
flood out the lower portion of Carmelo Street.
-
Roosevelt/High Curb Extensions
Construct a bulb-out at Roosevelt Street at the uphill side of High
Street. Catch basins and piping will need to be relocated.
-
Cass/Hartnell Cross Gutter Construction
Construct a cross gutter so water traveling down Cass Street can go
straight past Hartnell Street.
-
Dunecrest Avenue, Storm Run-Off Improvements
Install AC swale or rock protection to slow run-off into dunes to
prevent further erosion.
-
State Theater Funding Feasibility Analysis
Provides funding to evaluate all reports developed for this
acquisition and operation and provide alternatives for possible funding.
-
Traffic Calming CONA Phase II
Construct a landscaped median with curb extensions and pavement
treatment for a school crosswalk on Ramona near Lerwick.
-
Ferrante Park Snack Bar Improvements
Provides funding for "self help" program for painting, roof repairs
and general "updating" of existing structure.
-
Del Monte School, Replace Existing Turf Field
Remove the existing grass and weeds, re-grade and install new turf and
irrigation. This new sports field is needed particularly with the loss of
Soldiers Field in the Presidio.
-
Wave Street Sidewalk In Fill (curb, gutter, sidewalk & driveway
approach)
Concrete curb and gutter, sidewalk and driveways will be constructed
at Wave/McClellan to complete the improvements in this area.
-
Veteran’s Park Play Equipment Replacement
This project will remove and replace the existing play equipment with
new equipment to meet current standards.
-
Casa Verde Greening
Plant 2 or 3 trees along the sidewalk for beautification.
-
Repair Stone Gates at Colton/Alameda Street
Repair the wood gates, hinges and hardware and restore the stone
columns. Remove the overgrown ivy from the gates and stone columns.
-
Bay View School Play Equipment Replacement
Remove and replace aging and deteriorating play equipment.
- NIP Contingency Account FY 2004
Return to top
CUT-OFF PROJECTS
-
Harrison Street Pavement Treatment
Install interlocking pavers on Harrison Street at the High Street
(uphill) crosswalk and at the Bowen Street (downhill side) crosswalk to
help reduce traffic speed for vehicles turning at the intersection at
these two locations.
-
Bruce Lane Curb
Construct a standard curb and gutter along the south side of Bruce
Lane adjacent to the residential properties so the street sweeper can keep
that area clean.
-
Dune Planting Along Tide Avenue
Replant dune areas for erosion control and place wire barriers where
necessary for pedestrian access control.
-
Via Del Pinar Walking Path and Storm Drain Curb
An asphalt walkway with berm will be constructed for safer walking and
for drainage control.
-
Hellam/Monroe Drainage Improvements
Construct two catch basins and a cross gutter to underground the storm
water coming down Hellam.
-
Jacks Ball Park Sign at Franklin/Figueroa
Provides for sign identifying park for drivers coming on Figueroa from Del
Monte Avenue.
| FY 03/04 NIP
Contingency Account
|
$ 200,000 |
| NEIGHBORHOOD
IMPROVEMENT FUND TOTAL
|
$1,850,000 |
Return to top
Return to:
Budget Main Page |
Neighborhood
Improvement Program
General Fund Revenues | Revenues by Program |
Special Funds Revenues
General Fund Expenses |
Operating Expenses by Program
Capital Improvements Program |
Neighborhood Improvement Program
Staffing by
Program | Demographics & Statistics |
Budget News

Revised
02/21/10 L. Huelga
http://www.monterey.org/budget/2003-04/nipdescribe.html |