streambed between the two neighborhoods. Budget: $30,000
Del Monte Beach
9. Surf Way Chicanes & Re-alignment
This project installs chicanes along Surf Way as a traffic calming measure. Budget:
$125,000
Del Monte Grove - Laguna Grande
10. Traffic Calming Study
This study will investigate traffic flows in and around this neighborhood to determine
possible traffic mitigation measures to slow traffic. Budget: $50,000
11. Sound Attentuation Along Highway 1
This will look at what types of improvements can be used for sound abatement from freeway
traffic. Budget: $20,000
Fish Flats
12. Street Tree Program
This project will plant trees along the public right-of-way under the supervision of the
Parks Division. Budget: $5,000
13. Fisherman's Flats Sidewalk In-Fill, Phase 1
This will place sidewalk around the upper half of Marsala Circle. Budget: $15,000
14. Josselyn Canyon/Highway 68 Storm Drain Improvements (Study)
This will study the open storm drain in an attempt to lengthen the right turn lane from
Josselyn Canyon onto Highway 68. Budget: $7,500
Monterey Vista
15. Monte Vista Elementary School Tot-Lot Resilient Surfacing
This will provide a clean and safe rubberized surface around the playground structure. The
equipment & other appurtenances for the tot-lot are being furnished by the School. Budget:
$25,000
16. Eldorado/Pacific Street Sidewalk and Retaining Wall
This will reconstruct the S/E corner to allow pedestrians to safely travel up Eldorado on
a concrete sidewalk - and design intersection. Budget: $40,000
17. Monterey Vista Hillside Drainage
This is a continuation of providing funds to design and construct high priority drainage
projects that are identified in a drainage study completed for this area. Budget: $225,000
18. Cuesta Vista Drive Drainage Control - #40 to #76
This will install gutters & paving for drainage control along the top loop of Cuesta
Vista. Budget: $145,000
Return to top
New Monterey
19. Oak Street 900 Block Widening
This will widen the 900 block of Oak Street. Budget: $70,000
20. Spencer Street 800 Block Widening
This will widen the 800 Block of Spencer Street. Budget: $220,000
21. Spencer Street 400 Block Widening
This will widen the 400 block of Spencer Street. Budget: $130,000
22. Lobos Street 600 Block Drainage
This will improve drainage on the 600 block of Lobos Street. Budget: $55,000
Oak Grove
23. Tree Planting
This project will plant trees in the City right-of-way under the supervision of the Parks
Division. Budget: $5,000
Old Town
24. Neighborhood Traffic Calming Master Plan
This study will investigate traffic flows in and around this neighborhood with specific
emphasis on Franklin Street to determine potential solutions for reducing or slowing
traffic. Budget: $50,000
Skyline Forest
25. Forest Ridge Sidewalk Repairs
This will reconstruct the worst of the sunken and cracked sidewalk along Forest Ridge
Road. Budget: $16,000
Villa Del Monte
26. Del Rosa Sound Attenuation Study along Montecito Avenue.
This project is for a study to determine potential and acceptable sound measures that
could be constructed in the future. All improvements would be done on City right-of-ways
unless agreement could be made with Cal/Trans. Budget: $20,000
27. Palo Verde Dr., Garden Ave. and Del Robles Vegetation Attenuation/Study
This project will construct shrubs, bushes and trees for sound abatement from the freeway
in these areas on the City portion of the boundary. Budget: $15,000
City Wide Projects
28. Install Count Down Pedestian Timers on Busy Intersections
Install pedestrian digital count down timer heads to indicate time remaining on green
phase. Specific intersections will be determined by Traffic Division. Budget: $26,000
29. Recreation Trail, Casa Verde to Sloat - DG Walkway for Walkers
Install a continuous DG path next to the asphalt Recreation Trail. Budget: $30,000
30. City Library Remodel
Construct a staff room next to the "California Room" and establish a new
Information area for public review documents. Scope also includes remodeling the Solarium
to become the "new" public conference room. Budget: $28,000
31. Monterey Sports Center Expansion
This provides funds to "seed" the funding process to ultimately construct this
project. Budget: $250,000
Return to top
32. El Estero Lake Edge - Phase 2
Construct rock gabions next to the lake edge to stabilize the edges from erosion, to
improve the appearance and to provide safer access to the lake edge. Budget: $100,000
33. Dennis the Menace Park Improvements
This provides funds for renovating play equipment such as the suspension bridge,
rollerslide and the maze and work on walkways, access and lighting. Budget: $50,000
34. El Estero Eucalyptus Grove Improvements and Hospice Garden
This provides for upgrading the park area to make it more user friendly and inviting to
lake walkers and users. The Hospice improvements are being funded on a matching basis from
the Hospice Foundation and includes a separate space for people who wish to sit and enjoy
the flowers and area, or simply have a place for "remembering and honoring loved
ones". Budget: $100,000
35. Project Contingency
This is an appropriation to be used for project cost over-runs on an as needed
basis. Budget: $200,000
NIP TOTAL BUDGET 2000-01:
$2,131,500
Cut Off Projects (may be appropriated if funding becomes available):
36. Cypress Street 700 Block Widening
This widens this block of Cypress Street. Budget: $210,000
37. San Bernabe Drive/Pacific Street Re-aligning and Traffic Calming
This work will re-align the intersection to provide better views for vehicles entering
Pacific Street at San Bernabe and likewise, slow the traffic coming down Pacific Street to
make the left turn onto San Bernabe. Budget: $250,000