Circulation Element Improvements
This project will analyze traffic data and amend portions of the
Circulation Element of the General Plan. The project also includes design and
implementation of traffic improvements in specific areas throughout the City. Budget:
$134,000
Conference Center Chiller Replacement
This project will replace the old and worn out chiller at the
Conference Center. Budget: $167,000
Conference Center Electrical Upgrade-3rd Floor
This project will provide the electrical upgrade necessary to
accommodate various electrical needs for conferences, workshops and other seminars that
are conducted in the third floor areas without jeopardizing the integrity of the existing
electrical capacity. Budget: $50,000
Conference Center Sound System for Lobby
This project will provide a public address and sound system in the
open lobby and circulation areas of the Conference Center to page people and make general
and/or emergency announcements as required. Budget: $33,000
Contamination Investigation (Rec Trail, Lighthouse)
This project will determine the extent and necessary environmental
work that Monterey County Health has required the City to investigate as a result of
construction activities. Budget: $30,000
El Estero Irrigation Upgrades
This project will provide additional pumping capacity for the
reclaimed water from Lake El Estero to ensure a complete and adequate irrigation system
for surrounding parkland. Budget: $50,000
Few Memorial Hall Battery Rack Replacement
This project will investigate/repair and/or replace the necessary
components to ensure an updated and safe battery back up supply for emergency power outage
situations for the City Hall area. Budget: $20,000
Fire Station # 1 Parking Lot Step Replacement/Repair
This project will repair a potentially hazardous situation on the
parking lot stairway and repair paving sections in specified areas of the parking lot. Budget:
$7,000
Fire Stations 1, 2 & 3 Area Exhaust Fan Replacement
This project is to replace badly worn, outdated, and an under
capacity exhaust system in these buildings where vehicle exhaust is significant. Budget:
$25,000
Fire Station No 3 Electrical Upgrades
This project will provide updated electrical power to allow fire
station staff to weld and do other minor repairs to equipment without jeopardizing the
existing electrical capacity of the building. Budget: $8,000
Fire Station No 3 Roof Repairs
This project is to repair roof as required to stop leaks and other
maintenance problems. Budget: $50,000
French Consulate Bldg Adobe Walls Investigation/Repair/Seismic Design
This project will investigate the adobe wall on the rear of the
visitors center so as to stop drain water from seeping into the adobe wall and destroying
its structural integrity. At the same time a seismic design will be completed for the
building to determine to what extent the building needs to be brought up to current
seismic standards. Budget: $$65,000
Harbor Maintenance shop on Figueroa St. AC Repairs/Drain
This project will provide for repairs to the asphalt concrete areas
and repair drainage problems that currently exist. Budget: $12,000
Harbor Office Public Restrooms Upgrade
This project will upgrade and bring the fixture units up to current
code requirements. The project will also update and "freshen" both restrooms to
make them more presentable to the public and reduce the current maintenance and repair
schedule to keep them operable. Budget: $75,000
Iris Canyon Creek Reparation (Site Improvements/Design)
This project is to develop design alternatives to repair a
potentially serious erosion condition along Iris Canyon Creek. Budget: $25,000
Library Book Shelves-Seismic Bracing
This project is to provide seismic bracing for all the freestanding
bookshelves in the Library. Budget: $35,000
Library Improvements-Circulation Et al.
This project will renovate current office areas in the Library to
provide additional circulation and user space for staff. Mezzanine level: coordinator's
office becomes secure storage for California history room; new conference room from
solarium, existing conference room becomes coordinator's office. Budget: $13,000
Library Skylights & Surrounding Roof Area Replacements
This project will repair the leaking skylights and adjacent roof
areas of the Library which has become a high maintenance item over the last few years.
Currently the project has plastic draped over each of the skylights to prevent leakage
onto the recently completed carpet and electrical improvements in the Library. Budget:
$40,000
Osio Adobe Phone Closet/Rear Balcony Repair
This project will repair the phone closet and badly deteriorated
rear balcony area of the adobe. In both cases the wood is rotting creating structural
problems and future major maintenance issues. Budget: $14,000
Tunnel Alarm Panel and Fans Replacement
This project will upgrade and replace panels and the fans as
necessary within the tunnel to exhaust poor air caused by automobiles and/or other
conditions. Currently the panel alarm is inoperable and the fans are incapable of handling
any carbon monoxide build up within the tunnel. Budget: $50,000
Wharf II Corrosion Inhibiting Coating
This is for the corrosion inhibiting coating that was a part of the
Wharf II structural repair project from FY 99/00. The City owns most of the material to
provide this coating. However, the material has a shelf life and must be used before the
end of this summer. Budget: $100,000
Wharf I Structural Inspection