To: Mayor & City Council
From: City Manager
Date: May 25, 1999
Subject:  1999-2000 Proposed Budget Message



I am pleased to present to you the 1999-2000 Proposed Budget for the City of Monterey. It is a financial plan which is in balance, meets all financial policies that have been established by Council and, most importantly, directly addresses many significant Council priorities.

The proposed General Fund expenditures amount to $38.5 million which represents a 2.9% increase over the 1998-99 amended budget and a 6% increase over the original 1998-99 budget. After projected budget savings of $1.6 million are factored in, General Fund operating expenditures are expected to be $36.9 million. The total proposed expenditure for all funds is $57.7 million, which represents a 2.4% increase over the 1998-99 amended budget and a 6.9% increase over the original budget. Though significant funding has been included for a variety of priority programs and projects, once again many valuable programs were left unfunded due to resources not being sufficient to match the demand.

Return to top


 
All required General Fund reserves are fully funded. This includes a Reserve for Economic Uncertainty equivalent to 15% of the proposed General Fund operating expenditures (or $5.5 million) and a $2.7 million reserve for payment of liabilities related to the Del Monte Dunes lawsuit. Significant Capital Facilities Improvements Reserves ($3.2 million) also exist to provide partial funding for such projects as the expansion of the Civic Center and Sports Center.
We estimate that total General Fund revenues will amount to $37.7 million for 1999-2000. This will represent a 2.7% increase over the $36.7 million currently expected for the 1998-99 fiscal year and a 3.7% increase over the original 1998-99 budget's revenue projection.

 

Return to top

Transient occupancy tax (T.O.T.), which continues to make up 31% of General Fund revenues and is by far the City's largest revenue source, has flattened out somewhat in 1998-99. Receipts through February 1999 (latest information available) show a less than one-percent increase over the previous year’s comparable period. This trend, which may indicate that room rates and occupancy levels have peaked somewhat, caused us to reduce our revenue estimates for T.O.T. by $200,000 at mid-year. That brought our estimate to $11,000,000 for the General Fund which still amounts to a 3.6% increase for this year. We believe that a stronger Spring and early Summer, driven in part by aggressive marketing campaigns already in progress, will still allow us to achieve our current T.O.T. revenue estimate.

Our revenue projections for 1999-2000 in the General Fund show an increase of 3% or $330,000 over our current 1998-99 estimate. An additional $2.2 million in T.O.T. (16% of the total) is estimated to be allocated to the Neighborhood Improvement Fund in 1999-2000.

Our revenue projections for 1999-2000 in the General Fund show an increase of 3% or $330,000 over our current 1998-99 estimate. An additional $2.2 million in T.O.T. (16% of the total) is estimated to be allocated to the Neighborhood Improvement Fund in 1999-2000.

For the 1999-2000 fiscal year we anticipate property tax receipts to be $3.4 million. Property taxes make up 9% of all General Fund revenues. Other taxes collected by the City include the business license tax and utility users tax (estimated to be $2.2 million and $1.8 million respectively in 1999-2000).

Return to top



All of the special funds are programmed with balanced budgets, where operating revenues and transfers in are sufficient to pay the ongoing operational costs. Several funds are also paying for capital project expenditures, including the Gas Tax Fund, Tidelands Trust Fund, Sewer Line Maintenance Fund, Parking Fund, Marina Fund, and the Presidio Municipal Services Fund.

The Presidio Municipal Services Fund is included in the proposed budget for the first time. This fund has been established to account for all of the operational activities, projects, and revenues associated with the municipal services contract between the City and the U.S. Army. This will facilitate the tracking of ongoing expenditures and revenues, enabling us to monitor the fiscal impact of the Presidio contract on the City's budget. The proposed operating budget for this fund is approximately $1.6 million. In addition, more than $1 million is allocated for Presidio Pathway Lighting projects as part of the proposed capital improvement budget.

The proposed budget also includes a $600,000 advance from the Sewer Line Maintenance Fund to the Storm Water Utility Fund to pay for the cost of the Del Monte Outfall capital improvement project. This advance will be repaid over time, as the storm water revenue increases planned for funding of needed repairs to the storm water system take effect. It is also proposed that the General Fund advance $80,000 to the Storm Water Utility Fund to help pay for operational costs.

For all funds, the total proposed operating budget is $57,721,345, a 6.9% increase over the 1998-99 adopted budget. The total 1999-2000 estimated revenues are $61,410,729, or 6.5% greater than the 1998-99 adopted budget.

 

Return to top



The proposed 1999-2000 Capital Improvement Program budget amounts to more than $10 million. Of this amount, $2.24 million is allocated for Neighborhood Improvement projects, and the remaining $7.86 million is allocated for various capital replacement and capital improvement projects.

Included among the capital replacement projects are $260,000 for several Conference Center repairs and upgrades, $187,000 for Library upgrades, $425,000 for street resurfacing, $500,000 for miscellaneous sewer repair projects, and $600,000 for the replacement of the Del Monte Outfall.

Among the capital improvement projects, $1,000,000 is allocated for Civic Center expansion, including funding for planning and design work; more than $2,000,000 is included for Window on the Bay property acquisition and park development; and $225,000 is included for final design work for the Sports Center expansion. In addition, $700,000 is allocated for undergrounding of utilities on Del Monte Avenue between El Estero and Park. This project is funded by Rule 20 A monies made available through PG&E.

 

Return to top



The budget proposal represents an action plan for accomplishing the primary goals, objectives, and priorities of the City Council. The following discusses some of the more significant priority programs that are being addressed within the proposed budget plan.

Return to top



The capital improvement budget includes more than $2 million in funding for the acquisition and development of the Window on the Bay park project. The biggest share of this funding ($1.5 million) is provided by the General Fund via Redevelopment Agency debt payback. Other funding sources include the Tidelands Trust Fund ($350,000), Gas Tax Fund ($140,000), and Neighborhood Improvement Fund ($100,000). We are also continuing to seek outside funding for this project and we are hopeful that we will be able to secure significant funding from State and other agencies.

The CIP budget includes $75,000 from the General Fund and $150,000 from the Neighborhood Improvement Fund for the final design phase of the Monterey Sports Center Expansion project. Plans are also being made for the development of a program to raise private funding to help defray some of the costs for the expansion of the Sports Center. We will also be investigating and planning for the possibility of using long-term debt financing for this project.

Return to top

Initial capital costs ($1,000,000) are included in the General Fund CIP budget for the Civic Center Improvement project. This will provide funding to develop a phasing plan, specifications and cost estimates for the recommendations presented in the Civic Center Master Plan, including a new office building, renovation of the first floor of Colton Hall, remodeling of the second floor of Few Memorial Hall, and expansion of the El Cuartel public safety building.

In support of these three high priority projects, staff has developed a preliminary, Major Project Financing Plan that identifies various funding options available to finance the cost of these improvements. We intend to work closely with Council to fine-tune this plan and to update it on an ongoing basis as appropriate. The current plan demonstrates that we may be able to pay for the large majority of these capital improvement costs using current revenues and reserves.

Return to top

We are continuing to expand our involvement in the maintenance and upkeep of the buildings and infrastructure at the Presidio of Monterey in support of the Department of Defense demonstration project for provision of municipal services on military installations. The proposed operating budget includes $1.59 million for buildings, streets, sewers, storm drain, water systems maintenance and other special projects. In addition, the CIP budget includes approximately $1 million for the construction of pathway lighting at the Presidio. These costs will be fully reimbursed to the City by the U.S. Army.

We also anticipate that by October 1999, an agreement will be reached with the Army that will require a significant expansion of building maintenance services. This will entail the appropriation of additional staffing and resources beyond what is currently provided for in the proposed budget. Once the agreement is finalized, staff will return to Council with a request to appropriate the necessary staffing and resources to provide the required services. Again, the cost of these services will be fully reimbursed by the Army.

We are proposing the conversion of the Management Analyst position in Public Works Administration from a contract basis to a regular full-time position. We have determined that this position will be required on an ongoing basis to provide the necessary administrative support to provide municipal services at the Presidio. We will continue to be reimbursed by the Army for the cost of this position.

Return to top

The expansion of the Monterey Senior Center is a priority project for which the call for bids for construction was recently issued at the May 18, 1999 Council meeting. We anticipate the award of bid to happen in July, with construction currently projected to be completed in January or February, 2000. Funding for this project is included as part of the 1998-99 capital improvement budget in the amount of $180,000.

Another project is the City-wide Records Management System. We have included $15,000 in the City Clerk's budget for the initial costs associated with an electronic document management system which will be combined with $50,000 carried forward from the 1998-99 budget. This will allow funding for a portion of the first phase of the city-wide system. While it may be several years before this system is fully implemented, it is clear that the City will eventually reap significant efficiencies and improved customer service once it becomes fully operational.

A new full-time Parks Maintenance Worker position is proposed for the Parks Division. The cost for this position will be fully reimbursed by the State Parks Department through a contract for the maintenance of the Custom House Plaza. The total ongoing cost is approximately $50,000 per year, including supplies.

Return to top



Public safety will always be a mainstay on the list of high priority programs. It is difficult to overstate the importance of public safety to the people that live in, work in and visit our community. This is reaffirmed time and again in the responses to the periodic citizens surveys that we conduct through the City's newsletter, the Focus.

We must continue to work with the schools, neighborhood and business associations to address safety concerns and reinforce the safety aspect especially in light of the recent tragedies that have taken place on high school campuses throughout the nation. We need to stress that we must remain cautious however not let fear impact the overall quality of community life.

We are very pleased with the preliminary results of our Youth Diversion program. To further enhance the program we want to explore the possibility of creating a mentor program for youth at risk. We do not intend to duplicate an existing program i.e. Big Brothers, as our clients will be those youth who are assigned to the diversion program. We will first consider the use of municipal employees as mentors and then determine if we want to expand it to other potential adult role models.

Return to top

In a 2 year period we have expanded the use of volunteers in the police department from 1 to 30+. The volunteers consist of Police Explorers, office volunteers and the Monterey Volunteers in Policing who patrol the downtown area. The latter has spun off a similar program in Carmel by the Sea. MVPs have aided Fisherman’s Wharf and Del Monte Shopping Center on occasion. It is our intent to expand the MVP program to include the Recreation Trail and Cannery Row. We are also exploring the creation of a Police Reserve unit whereby citizen volunteers who undergo an extensive training program will ride along with patrol officers (in uniform) to assist them in their duties. Not only will it be an opportunity for residents to give back to the community in a special way, it will also enable us to assess a potential police officer pool of candidates.

We have introduced the concept of Community Oriented Policing and Problem Solving (COPPS) to all police personnel, city administration and executive staff from other departments. The philosophy of COPPS now needs to be instituted on a trial basis in a specific area of the city to assess its overall capabilities. We have decided to focus on North Fremont and the East side of the community as the pilot program site. Our experience will guide the future utilization of this policing concept.

Return to top

In the Police Department, we are allocating funds to increase our technological capabilities, including the purchase of a new Police Records Management System. The $75,000 cost of the records management system will be paid through the Information Services budget, and will be recouped over a five-year period from the Police operating budget via the annual Information Services chargeback. This new system will enhance the Police Department's crime analysis capabilities (including mapping and photo analysis), allow access to the database from the mobile computers in the field units, and also ensures Y2K compatibility.

Return to top

We are also budgeting $40,000 in the Information Services budget for the acquisition of 14 mobile computers. The City has received a grant from the U.S. Department of Justice COPS-More 98 program in the amount of $107,531 for the acquisition of these computers; $40,000 is the local match required. The Information Services Fund will recoup this acquisition cost from the Police operating budget over a three-year period. These mobile computers will provide the patrol officer with increased communications tools and improved access to police information.

In the area of traffic planning and traffic safety, we have allocated funding in the amount of $20,000 toward the reorganization of our Traffic Engineering division. The reorganization analysis is currently underway, however we expect to return to Council with a recommendation that will provide for the allocation of upgraded staffing toward the area of transportation planning. This will allow us to improve our transportation planning/analysis capabilities and enable us to address a backlog of traffic, parking, and other circulation and traffic safety- related issues.

The Fire Department is also undergoing an analysis of its management organization and service delivery. No specific funding has been included in the current budget proposal for recommendations that may arise from this analysis, however, staff will return to Council for any future budget adjustments that may be required. The primary objective will be to create a management structure which will be best suited to guide and support the Fire Department's service delivery in the future.

Return to top



Historic Preservation and its corollary issues are of great importance to the citizens of Monterey. Several historic related programs, projects and issues are addressed in the proposed budget.

One position that is being recommended for addition is an Archivist in the Library. This position has been funded over the last couple of years through a contractual arrangement. The proposed budget includes a regular part-time position in order to perform the archival functions in the Library at a cost of approximately $27,400. This position will enable the Library to continue and improve upon its efforts to preserve our community's history through programs and projects like the California History Room, "Shades of Monterey" photo project, "Preserving Your Familiy's History program", and others.

Another position recommended for upgrade is the Museum Attendant position. It is proposed that this position be upgraded from a temporary, part-time status to regular, part-time status. This will provide additional support of the many Museum and historic related programs in which the City is currently involved.

Return to top

The Cannery Row Survey for buildings and districts is expected to be completed during the fiscal year. $30,000 has been included in the Planning budget to complete this survey by the fall of this year. The survey will be used to assist in the implementation of the Cannery Row Land Use Plan.

The draft Historic Master Plan is currently undergoing the review and approval process. It is anticipated it will be approved this fall as will be the updating of the historic preservation ordinance. The City has applied for a grant to complete the historic surveys.

We will continue with the implementation of the Lower Presidio Historic Park and Museum. The Council approved a request for proposals for the development of the Master Plan for the Lower Presidio Historic Park at its meeting of May 18, 1999. The current schedule calls for the completion of this master plan by June, 2000. In the meantime, we are proceeding with the repairs and renovations to Presidio Museum building. A call for bids for this work was also issued by the Council at the May 18, 1999 meeting. Approximately $30,000 is included in the proposed Museum operating budget and will be added to the $30,000 included in the 1998-99 operating budget for the development of exhibits at the Presidio of Monterey Museum.

Return to top

We continue to expand Public Education on historic preservation programs. Through articles in the Focus newsletter, workshops and other forums, we will bring attention and focus to the historic preservation issue. We are making plans to host the California Preservation Conference in Monterey in April, 2000. We are ensuring that the programs and sessions for this conference will be designed to be of particular interest to local historians and property owners.

To encourage property owners to participate in historic preservation programs, the Council will consider new incentive programs in the current proposed historic preservation ordinance. We have adopted the provisions of the Mills Act which provides property tax relief for the owners of historic properties. The proposed budget includes $65,000 in the Housing program and $10,000 in the Economic Development program budget for historic preservation grants. We will investigate the feasibility of other types of incentive programs as well.

The Sesquicentennial Commemoration is another high priority program that requires significant resources. The proposed Museum budget includes another $43,750 for costs associated with Sesquicentennial programs and exhibits. A page has also been developed on the City's web site that highlights the various programs and activities planned, as well providing other information about the important moments in the history of California.

Return to top



We are currently planning to initiate the process for updating the City's General Plan. The first phase of this process involves an update of the plan for references to the year 2000. This will be done by staff and will be completed during the next fiscal year. This includes the required staff analysis, development of required plan amendments, public meetings and hearings by the Planning Commission and City Council. The next phase will be the full General Plan update and will be done with the assistance of a consultant firm after the year 2000 census is completed. This process is expected to require thousands of staff hours, hundreds of hours of public meetings, and several years to complete.

The Tynan Lumber site is a strategically located parcel that has recently been vacated. This represents an important opportunity to evaluate this site and develop plans which identify the highest and best use for this area in light of current day requirements. Staff has already developed new guidelines for this area and is awaiting responses from the current property owners. After input is received from the property owners, staff will make recommendations to the Planning Commission and City Council regarding the adoption of new development guidelines, or the maintenance of existing ones.

 

Return to top

The completion of the Coastal Plan Implementation program is another high priority scheduled for the budget year. The City has received a grant from the State of California which we will use to hire a consultant to complete the implementation plan. Upon development of recommended amendments, these will be forwarded to Council for adoption.

The Del Monte Beach Re-subdivision, environmental impact review, and the requisite local coastal plan amendment will be accomplished during the fiscal year. We are currently developing estimates of the cost to do an EIR on the re-subdivision plans. After the final plans are submitted by the applicants, proposed coastal plan amendments will be developed, the EIR will be conducted, and the Planning Commission will conduct required public hearings prior to submitting them to the City Council for consideration and adoption.

Return to top

Upcoming development projects like the Cannery Row Marketplace and the large screen theatre project proposed for South Cannery Row will continue to be reviewed for consistency with the Cannery Row Land Use Plan.

The proposed budget also includes funding ($10,000) in the Planning program for a multi-modal transportation study. This study will research the feasibility and possible location for a multi-modal transportation center within the downtown area.

Return to top



The construction of the C-21 Project, including a six-screen theatre, retail, and housing is well underway. It is anticipated that the project will be completed by next winter. Required funding of approximately $900,000 is included in the Housing Program budget for the completion of this project. It is anticipated that this project will be an economic generator for the downtown area.

The economic revitalization of North Fremont business area and surrounding residential neighborhoods is an important priority. One of the issues we are asking Council to consider is the appropriation of consultant funding for the development of a plan for the North Fremont area.

The City continues to encourage retention and expansion of existing local business. We continue to provide funding in the Economic Development budget for the commercial building façade grant program in the amount of $42,000. We also are continuing support for the micro-loan program for small businesses within the Housing & Community Development program. This program is administered by the California Coastal Rural Development Corporation and has provided business advice and assistance to more than 90 individuals since its inception in 1995-96. Loans to small businesses range from $5,000 to $25,000. In addition, the City provides staff support and funding to business improvement districts such as the Old Monterey Business Association and the New Monterey Business District.

The implementation of the "supplemental water" feasibility study is expected for the budget year. The feasibility study has been completed and is being printed for distribution at this time. The study will be reviewed at an upcoming City Council study session. Staff will seek guidance from Council as to the direction to take with respect to the various options presented in the study for creating water credits for public and other not-for-profit projects.

Return to top



The development of a child-care center at the Presidio is among the highest of the many priority projects in which we are involved. At the recent community forum on City priorities that was conducted during this year's budget process, this was one of the most often mentioned. In addition to the $90,000 included in the 1998-99 NIP program budget, another $100,000 is included in the proposed Neighborhood Improvement program for repairs and renovation of the Child Care Facility at the Presidio. We are proceeding with the development of this significant priority, and anticipate issuing a request for proposals from private providers for the operation of the day care program within the next few months. This will occur after lease negotiations with the Army are completed.

We are also in the process of evaluating the adequacy of current recreational afterschool programs to meet community needs. This item, in addition to programs for older teens, will be referred to the Parks & Recreation Commission for their recommendation regarding possible new programs, schedules, and appropriate fee structure.

Return to top

In connection with afterschool programs, the proposed budget calls for the conversion of the Library's Afterschool Academic Enrichment Program Coordinator from a contract position to a regular, full-time position. This program has proven to be a great benefit to our community, including the students, parents, educators, and volunteers who have worked very hard to make this the success it has become.

The City's volunteer program also continues to be a success story. Although the grant funding we previously received from the Packard Foundation has run out, we continue to fully fund the volunteer program. We are in constant search for ways to increase our volunteer efforts throughout the City.

I've touched here on some of the most significant aspects of our work program for the budget year. For a complete list of proposed Council priorities, please see the attached "City Council Priorities for 1999-2000".

Return to top



For the 1999-2000 fiscal year, we have a balanced budget and an unappropriated General Fund ending balance of $261,000. However, over the course of the next five years our forecast indicates that expenditures, transfers and reserve requirements exceed available resources by a cumulative total of more than $3 million. This means that in the years ahead we will have to find additional revenues, reduce reserves or make other expenditure reductions in order to balance the budget.

We are very fortunate here in Monterey to be able to fund the many worthwhile programs mentioned in this memo. However, given the financial forecast discussed above, we must be cautious about adding ongoing costs in the years ahead. In addition to the costs associated with supporting our current programs, we are also attempting to set aside adequate funds for high-priority capital projects such as the Civic Center, Window on the Bay and the Sports Center expansion. This is a delicate balance but I believe the budget plan presented here will meet the priorities established by the Council and provide the citizens with a high level of service.

 

Fred Meurer

Return to top

Budget Overview
Total Revenues - All | General Fund Revenues | Special Funds Revenues
Operating Expenditures - All | General Fund Operating Expenditures
Capital Improvements Program | Staffing by Program
General Fund Revenue & Expenditure Trends | Demographics & Statistics

City of Montery Home Page Button (1747 bytes)


Rev. 10/25/07 - J. Splane - http://www.monterey.org/budget/1999/cmmessage.html