City of Monterey
1998-99 Adopted Budget
COMMUNITY IMPROVEMENT PROJECTS

 

General Government | Leisure, Cultural and Social Services | Public Safety | Public Utilities | Transportation
 
 
 
 
GENERAL GOVERNMENT

1. Demolish Houses: 587 Van Buren & Hwy 68 at Olmsted - These two city-owned residential houses have been leased to outside parties. However, at present, only one is occupied (Hwy 68/Olmsted), and the rental income generated by it does not cover maintenance costs. This project will demolish the two houses. Budget: $30,000.

2. Ryan Ranch Mechanical Shop Heaters - This is to replace the heaters in the Mechanical shop at the City's Ryan Ranch corporate yard. Existing heaters emit erosive carbon dioxide and are in constant need of repair and maintenance. This project will both upgrade and provide energy savings for the heating system. Budget: $17,000.

3. Ryan Ranch Roof Repairs - This project will provide funds for the repair of all three buildings at Ryan Ranch corporate yard. Funds were appropriated in FY 97/98 for the installation of roof gutters, which was put on hold until this current project was appropriated by Council. We will be able to obtain a better price by doing both at the same time. Budget: $40,000.
Return to top


LEISURE, CULTURAL AND SOCIAL SERVICES

1. Alvarado Street Upgrade - This project will provide for upgrades to the Alvarado Street area by completing the following: removal of existing tree lights and installation of "up" lights in the tree wells; installation of concrete planters and plants on Bonifacio between Alvarado and Washington and the repair of cracked and broken pavers along Alvarado Street. The cost for this project is to be reimbursed by the Alvarado Street Maintenance District. Budget: $54,700.

2. Conference Center Chiller No. 1 Conversion - The scope of this project is to change out the current motor in the refrigeration system which uses an R-11 refrigerant gas for a different system that falls within the current EPA and Air Quality Standards. Valves and other piping will need to be replaced along with replacing the motor. Budget: $75,000.

3. Conference Center Roof - Council recently approved the design of the roof replacement for the Conference Center. This project will provide the construction funding for that work. The existing roof is "original" and has exceeded its expected lifetime. Budget: $150,000 plus $50,000 from prior year.

4. DLI Museum/Restroom Renovation - This project will provide the remaining funds needed to upgrade the museum and restroom on the Lower Presidio/Historic Park. Budget: $105,000 plus $175,000 from prior year.

5. Fisherman's Wharf Entrance Sign - This project is to provide the funding, at the request of the Fisherman's Wharf Association, to provide an entrance sign in the median on Figueroa at the intersection at Del Monte. Budget: $25,000.

6. Library Carpet Replacement/Electrical - This project is to replace all of the carpeting in the Library. In addition, all electrical outlets, telephone outlets, computer connections, and other miscellaneous electrical items are to be installed in the floor. This project was originally included in the 1997-98 CIP program, however, it was placed on hold to determine the impact of the proposed Library expansion project. It has since been concluded that the carpet/electrical project can proceed, although it has been deferred until next fiscal year due to other pressing requirements. Budget: $0.

7. Library Interior Paint - this project entails the painting of the entire interior of the Library. It is scheduled to be accomplished along with the carpet replacement project above. Budget: $0.

8. Library Technical Services Room Renovation - This project will provide improvements to the technical services room of the Library by doing minor cabinet and counter work, electrical improvements and other minor related tasks to make the operation of the room more efficient. Budget: $5,000.

9. Monterey Senior Center Expansion Phase 2 - This project provides matching funds to the proposed NIP project for this year to complete the construction of the expansion and renovation of this facility. This project was approved as part of the FY 97/98 CIP and NIP programs. Budget: $100,000.

10. Monterey Sports Center Expansion Phase 2 - This project provides funds for the next phase of development of the Monterey Sports Center Expansion project. Phase 2 includes further development of the design, coordination with the Planning Commission and Architectural Review Committee to address issues and requirements for the expansion (particularly the use of the B.P. site), and design elements of the facility. Budget: $100,000.

11. Rec Trail "A" Drainage Improvements - This project will provide a drainage system for a "low spot" along the Recreation Trail near the Naval Postgraduate School. Last year's rains resulted in major flooding on the Rec Trail in this area, creating a safety problem for users and a maintenance problem for park staff. Budget: $10,000.

12. Sollecito Ball Park Bleacher Replacement - This project has partial funding from a previous CIP program year. These additional funds will allow the bleachers to be completely replaced with modern, safer units which also comply with current ADA standards and requirements. Budget: $100,000 plus $35,000 from prior year.

13. Wharf 2 Repairs - This project will provide the final phase of funding for the Structural Repair and Refurbishment of Wharf 2. $1,179,000 has already been appropriated and used for a portion of the work under the warehouse and one section of the fish unloading area, as well as design and permitting. The work includes new piles, timbers, beams, stringers, caps, decking as necessary, new paving, and the replacement of lights and rails. Budget: $1,836,000 plus $1,179,000 from prior year.

14. Whispering Pines Park Restroom Renovation - This project is to renovate and upgrade the older restroom in the Whispering Pines Park. A new restroom across from this building was completed two years ago. This work will complete the long-term plan of modernizing and upgrading the facilities that are heavily used by the children's programs in the summer and other large gatherings or parties that occur year-round. This will bring the project up to current ADA standards and repair or replace any structural problems the facilities may have. Budget: $40,000.

15. Window on the Bay Property Acquisition - This is an appropriation for the acquisition of property within the Window on the Bay along Del Monte Avenue. Funding sources include the Tidelands Trust Fund and Gas Tax Fund. Budget: $375,000.
Return to top


PUBLIC SAFETY

1. Fire Station No. 2 Roof Repairs - This project will provide for the repair and replacement of the roof at Fire Station No. 2. The roof is old, requires extensive maintenance, and is beyond economical spot repair. Budget: $40,000.

2. Fire Station No. 1 Sprinkler System - This project will provide the necessary replacement and repair of sprinkler heads and other piping to upgrade the sprinkler system in Fire Station No. 1. Budget: $10,000.
Return to top

 
 
PUBLIC UTILITIES

1. Col. Bishop Court Storm Drain - This project is located between Col. Bishop Court and Watson Street and is to provide a storm drain pipe with a new catch basin and outlet structure. The new catch basin is to be located at the end of Col. Bishop Court. This project will prevent property damage to the residents on Watson because the existing seepage pit cannot handle the current storm drain water flows.  Budget: $25,000.

2. Del Monte Beach Outfall Repair Beach Way - Replace 30 feet of elevated storm drain line which was destroyed in February 1998 by the storms. Budget: $7,000.

3. Del Monte Lake Outfall - Replace last 60 feet of the 48 inch diameter outfall pipe from Del Monte Lake and construct a new end wall and stairway over the pipe and reconstruct and revegetate the sand dunes. Budget: $204,000.

4. FEMA Matching Funds - The City is required to provide a certain match for all of the Federal Emergency Funds provided by FEMA. This year, an estimated $1,153,000 is being spent with funds to be reimbursed under the FEMA program. $100,000 is estimated to be the City's portion. Budget: $100,000.

5. Glenwood Drive/Iris Canyon Slide Removal - Reconstruct earth fill supporting dirt access road and sewer main adjacent to Glenwood Drive apartments. Budget: $100,000.

6. North Fremont Street Storm Drain (Slipline) - This project will provide a slip lining for an existing deteriorated corrugated metal pipe (CMP) along Fremont Street between Casa Verde and south Palo Verde. Budget: $182,000.

7. North Fremont Storm Drains Improvements - This project extends from Casa Verde to the Del Rey Oaks city limits along Fremont Street. This project specifies various sized reinforced concrete pipe (RCP) in sizes from 12 to 30 inches in diameter, ultimately connecting into a large box culvert near Casanova Avenue where it ultimately flows into Roberts Lake. This is a new storm drain to remediate street flooding during rains. Budget: $532,000.

8. Linda Vista Pl. Slope Repair - This project involves constructrion of a wall to support Linda Vista Place and the adjacent Cal-Am Water Co. water main.  Budget: $144,250.

9. San Bernabe Storm Drains Improvements - The work in this area is along San Bernabe Drive between Grove and Martin Streets. The project is to install a storm drain line on the north side of San Bernabe from the corner of Via Encanto to Martin Street, served by six new catch basins, two french drains and a culvert. This project will redirect drainage to the creek bed below Via Paraiso Park which runs parallel to Martin Street, reducing flooding along San Bernabe, Colton, and Alameda streets. Budget: $110,000.

10. Stephans Place Storm Drains - Reroute stream bed to divert water from the back of 230 Via Del Pinar to the quarry park creek bed thereby eliminating the threat of future flooding on Stephan Place and Via Del Pinar. Budget: $392,000.

11. Whispering Pines Park Channel - Repair slope failure which occurred in February 1998 storms within Whispering Pines Park adjacent to the creek bed. Budget: $47,000.
Return to top


TRANSPORTATION 

1. B.P. Lot Parking Improvements - This project will provide funds for the development of an interim parking lot located at the B.P. station at the corner of Washington and Del Monte Avenue. The lease for the gas station expired in October of 1998 and it is anticipated that the site will be available for this work in December of this year. Budget: $90,000.

2. CR-1 Parking Equipment - This project is to replace ten-year-old equipment with a newer more efficient type currently being used throughout the City. The existing machine has become antiquated, making replacement of parts and other maintenance difficult. Budget: $75,000.

3. Cypress Parking Lot Paving/Repair - This project is to repair uplifts, potholes, cracks in the asphalt and other necessary repairs to the Cypress Parking Lot located across from Hartnell Gulch from the Library on Pacific Street.  Budget: $10,000.

4. East Custom House Garage Entry Pay Station - This project will replace three existing entry pay stations with newer, modern facilities that accept coins, bills, credit cards and provide change. The system will be more user friendly and will provide more flexibility for future proposed rate increases. Budget: $63,000.

5. Library Parking Lot Resurfacing - This project will repair and resurface as necessary the parking lot located behind the Library. Budget: $5,000.

6. Miscellaneous Traffic Improvements (1998) - This project is to provide funds as required throughout the fiscal year for miscellaneous traffic improvements throughout the City. This may include the replacement or repair of pedestrian signals, stop lights, stop signs and other traffic related improvements. Budget: $50,000.

7. Monterey Bay Park Parking Lot Improvements - This project is to provide necessary improvements as a part of the approved master plan for the Monterey Bay Park Phase 2. This parking lot is located adjacent to the kayak building on the north end of the Window on the Bay park. This project will provide new meters, new paving and represents one portion of Phase 2 of the Monterey Bay Park project. Budget: $100,000.

8. Parking Lot No. 10 Resurfacing - This parking lot is located behind Palace Stationary business on Calle Principal and Jefferson. The lot is currently leased by the City and has twenty parking meters. Budget: $25,000.

9. Bridges Seismic Retrofit: Larkin St. and Skyline Forest Drive - This will fund the design of the upgrades to two city bridges to bring them into compliance with current earthquake resistant code. The project is fully reimbursable by the State's Highway Bridge Repair and Replacement (HBRR) fund. This phase of the project is for planning, site analysis (soils/geotechnical) and design (preparation of plans, specifications, cost estimates, permits and related bid documents). Budget: $240,000.

10. Street Resurfacing 1999 - This project is funding for the annual Street Maintenance program. This year because of the heavy rainfall and flooding, a significant amount of repaving activity will be required during the late summer and early fall months. Funding sources include the General Fund and Gas Tax Fund. Budget: $1,058,700.